Cavities - Fabrication
cavity performance
Paper Title Page
THP061 Performance of FRIB Production Quarter-Wave and Half-Wave Resonators in Dewar Certification Tests 1023
 
  • W. Hartung, S.H. Kim, D. Norton, J.T. Popielarski, K. Saito, J.F. Schwartz, C. Wei, T. Xu, C. Zhang
    FRIB, East Lansing, Michigan, USA
 
  The Facility for Rare Isotope Beams (FRIB) is under construction at Michigan State University (MSU). The FRIB superconducting driver linac will accelerate ion beams to 200 MeV per nucleon. The driver linac requires 104 quarter-wave resonators (QWRs, β = 0.041 and 0.085) and 220 half-wave resonators (HWRs, β = 0.29 and 0.54). The jacketed resonators are Dewar tested at MSU before installation into cryomodules. The cryomodules for β = 0.041, 0.085, and 0.29 have been completed and certified; 88% of the β = 0.54 HWRs have been certified (as of March 2019). Beam commissioning of the QWR cryomodules is in progress. The Dewar certification tests have provided valuable statistics on the performance of production QWRs and HWRs at 4.3 K and 2 K and on performance limits. Results will be presented.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-SRF2019-THP061  
About • paper received ※ 12 July 2019       paper accepted ※ 13 August 2019       issue date ※ 14 August 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
FRCAA5
SRF Activities and Progress at IHEP  
 
  • F.S. He, F. Bing, J. Dai, C. Dong, T.M. Huang, S. Jin, D.B. Li, Z.Q. Li, H.Y. Lin, B.Q. Liu, Z.C. Liu, Q. Ma, F. Meng, Z.H. Mi, W.M. Pan, P. Sha, Q.Y. Wang, L.G. Xiao, F.Y. Yang, J.Y. Zhai, P. Zhang, X.Y. Zhang, H.J. Zheng, Q. Zhou
    IHEP, Beijing, People’s Republic of China
 
  There are several active SRF projects at IHEP, including HEPS, CEPC, CSNS upgrade, SHINE and PAPS SRF facility. Four cryomodules with 166.6 MHz β=1 QWR cavities are proposed for HEPS, while each cavity will providing 1.2 MV and 145 kW to the electron beam. The vertical and horizotal tests of the proof-of-principle cavities were recently conducted. 650 MHz 2-cell cavities and 1.3 GHz 9-cell cavities were proposed for the CEPC, and high Q technology is adopted by the project. Infrastructures are developed for the high Q study, while R&D on single-cell cavities are under-way. Efforts on learning mass-production of cavities and cavity-string were also made for both CEPC and SHINE projects. SRF linac from 80 MeV to over 300 MeV were adopted for the upgrade of CSNS, with 325 MHz Double-spoke cavities at β=0.50 and 650 MHz-5cell elliptical cavities at β=0.65. The PAPS SRF facility is biased on mass production for large SRF projects, i.e. aiming at assembly and testing of 200-400 cavities & couplers and 20 cryomodules per year. The equipment installation and commissioning is on going. The activities and progress of these SRF projects with be addressed in this presentation.  
slides icon Slides FRCAA5 [13.318 MB]  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)